


Sandvik / Tamrock
810 170 09 Bearing, Needle
Rock Drill Spare Part
| Part Number | 810 170 09 |
| Description | Bearing, Needle |
| Brand | Sandvik (Tamrock) |
| Assembly | Motor, Hydraulic |
| Type | Rock Drill Spare Part |
Quick answer
810 170 09 (also written 81017009, 810-170-09, or 810.170.09) is a Sandvik bearing, needle spare part used in the Motor, Hydraulic assembly of the Sandvik DS411-C. Verified compatible with 5 Sandvik machine models including DC302R, DS410, DS410-C. Used in 3 drifter configurations (HE300, HL300, HL300S). Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.
Part code alternate forms: 81017009, 810 170 09, 810-170-09.
Compatible machines
5
Drifter configurations
3
OEM cross-reference
810 170 09
About Sandvik 810 170 09 Bearing, Needle
Precision-manufactured for the Sandvik DS411-C, this bearing component in the Motor, Hydraulic provides reliable rotational support even under the harsh vibration and impact conditions of rock drilling. Timely replacement prevents cascading damage to adjacent drivetrain components.
This is an OEM-compatible aftermarket replacement part for the Sandvik DS411-C (DS411-C). Also compatible with Tamrock branded equipment of the same model series. BK Drilling supplies this part with fast worldwide shipping and competitive pricing.
Frequently asked questions
Why are bearings critical in drilling equipment?
Bearings support rotating shafts and components under extreme loads and vibrations. Failed bearings can cause catastrophic damage to gearboxes, drive trains, and drilling mechanisms, leading to extended downtime and costly repairs.
What causes premature bearing failure in mining equipment?
Common causes include contamination from dust and water ingress, misalignment during installation, excessive loads, inadequate lubrication, and operating beyond rated temperature ranges. Proper sealing and regular lubrication schedules are essential preventive measures.



