BK DRILLING
5112318262 5112 3182 62 5112-3182-62 BEARING SET
Representative Photo
5112318262 5112 3182 62 5112-3182-62 BEARING SET - Epiroc Technical Drawing
Technical Drawing
Click to enlarge

Epiroc / Atlas Copco

5112 3182 62 BEARING SET

Boomer E2 C Drill Rig Spare Part

Available — Request Quote
Part Number5112 3182 62
DescriptionBEARING SET
BrandEpiroc (Atlas Copco)
AssemblyGEAR HOUS. COMP
TypeDrill Rig Spare Part

Quick answer

5112 3182 62 (also written 5112318262, 5112-3182-62, or 5112.3182.62) is a Epiroc bearing set spare part used in the GEAR HOUS. COMP assembly of the Epiroc Boomer E2 C. Verified compatible with 4 Epiroc machine models including Boomer E2 C, Boomer L2D 8999 1009 00, Boomer M2D. Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.

Part code alternate forms: 5112318262, 5112 3182 62, 5112-3182-62.

Compatible machines

4

OEM cross-reference

5112 3182 62

About Epiroc 5112 3182 62 BEARING SET

This high-performance bearing is designed for the Sandvik Boomer E2 C and serves a critical role in the GEAR HOUS. COMP. It supports rotating elements under heavy axial and radial loads typical in underground and surface drilling applications, ensuring smooth and reliable machine operation.

This is an OEM-compatible aftermarket replacement part for the Epiroc Boomer E2 C (Boomer E2 C). BK Drilling supplies this part with fast worldwide shipping and competitive pricing.

Frequently asked questions

Why are bearings critical in drilling equipment?

Bearings support rotating shafts and components under extreme loads and vibrations. Failed bearings can cause catastrophic damage to gearboxes, drive trains, and drilling mechanisms, leading to extended downtime and costly repairs.

What causes premature bearing failure in mining equipment?

Common causes include contamination from dust and water ingress, misalignment during installation, excessive loads, inadequate lubrication, and operating beyond rated temperature ranges. Proper sealing and regular lubrication schedules are essential preventive measures.