BK DRILLING
3222036016 3222 0360 16 3222-0360-16 BEARING RING
Representative Photo
3222036016 3222 0360 16 3222-0360-16 BEARING RING - Epiroc Technical Drawing
Technical Drawing
Click to enlarge

Epiroc / Atlas Copco

3222 0360 16 BEARING RING

FlexiROC T35 Drill Rig Spare Part

Available — Request Quote
Part Number3222 0360 16
DescriptionBEARING RING
BrandEpiroc (Atlas Copco)
AssemblyBOOM SYSTEM
TypeDrill Rig Spare Part

Quick answer

3222 0360 16 (also written 3222036016, 3222-0360-16, or 3222.0360.16) is a Epiroc bearing ring spare part used in the BOOM SYSTEM assembly of the Epiroc FlexiROC T35. Verified compatible with 4 Epiroc machine models including ROC D7-11, FlexiROC T35, 2016 FLEXİ ROC T35. Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.

Part code alternate forms: 3222036016, 3222 0360 16, 3222-0360-16.

Compatible machines

4

OEM cross-reference

3222 0360 16

About Epiroc 3222 0360 16 BEARING RING

Engineered to withstand the extreme loads and vibrations encountered in drilling operations, this bearing maintains precise alignment of rotating components in the Sandvik FlexiROC T35. As part of the BOOM SYSTEM, proper bearing maintenance is essential for optimal drill performance and reduced machine downtime.

This is an OEM-compatible aftermarket replacement part for the Epiroc FlexiROC T35 (FlexiROC T35). BK Drilling supplies this part with fast worldwide shipping and competitive pricing.

Frequently asked questions

Why are bearings critical in drilling equipment?

Bearings support rotating shafts and components under extreme loads and vibrations. Failed bearings can cause catastrophic damage to gearboxes, drive trains, and drilling mechanisms, leading to extended downtime and costly repairs.

What causes premature bearing failure in mining equipment?

Common causes include contamination from dust and water ingress, misalignment during installation, excessive loads, inadequate lubrication, and operating beyond rated temperature ranges. Proper sealing and regular lubrication schedules are essential preventive measures.