BK DRILLING
3128309345 3128 3093 45 3128-3093-45 BEARING SET
Representative Photo
3128309345 3128 3093 45 3128-3093-45 BEARING SET - Epiroc Technical Drawing
Technical Drawing
Click to enlarge

Epiroc / Atlas Copco

3128 3093 45 BEARING SET

Boomer L2D 8999 1009 00 Drill Rig Spare Part

Available — Request Quote
Part Number3128 3093 45
DescriptionBEARING SET
BrandEpiroc (Atlas Copco)
AssemblyPUMP
TypeDrill Rig Spare Part

Compatibility

Machine Models

Quick answer

3128 3093 45 (also written 3128309345, 3128-3093-45, or 3128.3093.45) is a Epiroc bearing set spare part used in the PUMP assembly of the Epiroc Boomer L2D 8999 1009 00. Verified compatible with 1 Epiroc machine model including Boomer L2D 8999 1009 00. Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.

Part code alternate forms: 3128309345, 3128 3093 45, 3128-3093-45.

Compatible machines

1

OEM cross-reference

3128 3093 45

About Epiroc 3128 3093 45 BEARING SET

Precision-manufactured for the Sandvik Boomer L2D 8999 1009 00, this bearing component in the PUMP provides reliable rotational support even under the harsh vibration and impact conditions of rock drilling. Timely replacement prevents cascading damage to adjacent drivetrain components.

This is an OEM-compatible aftermarket replacement part for the Epiroc Boomer L2D 8999 1009 00 (Boomer L2D 8999 1009 00). BK Drilling supplies this part with fast worldwide shipping and competitive pricing.

Frequently asked questions

Why are bearings critical in drilling equipment?

Bearings support rotating shafts and components under extreme loads and vibrations. Failed bearings can cause catastrophic damage to gearboxes, drive trains, and drilling mechanisms, leading to extended downtime and costly repairs.

What causes premature bearing failure in mining equipment?

Common causes include contamination from dust and water ingress, misalignment during installation, excessive loads, inadequate lubrication, and operating beyond rated temperature ranges. Proper sealing and regular lubrication schedules are essential preventive measures.