BK DRILLING
3115212900 3115 2129 00 3115-2129-00 PISTON (ME/MEX) - Epiroc Genuine Product Photo
Product Photo
3115212900 3115 2129 00 3115-2129-00 PISTON (ME/MEX) - Epiroc Technical Drawing
Technical Drawing
Click to enlarge

Epiroc / Atlas Copco

3115 2129 00 PISTON (ME/MEX)

Boomer 282 Rock Drill Spare Part

Available — Request Quote
Part Number3115 2129 00
DescriptionPISTON (ME/MEX)
BrandEpiroc (Atlas Copco)
AssemblyREPAIR SET
TypeRock Drill Spare Part

Compatibility

Drifter Models

COP 1638COP 1838COP 1838MECOP 1838ME-T38COP 1838ME-T45COP 1838MUXCOP 2560

Machine Models

Quick answer

3115 2129 00 (also written 3115212900, 3115-2129-00, or 3115.2129.00) is a Epiroc piston (me/mex) spare part used in the REPAIR SET assembly of the Epiroc Boomer 282. Verified compatible with 8 Epiroc machine models including Boomer 282, Rocket Boomer 282, COP1838ME. Used in 7 drifter configurations (COP 1638, COP 1838, COP 1838ME). Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.

Part code alternate forms: 3115212900, 3115 2129 00, 3115-2129-00.

Compatible machines

8

Drifter configurations

7

OEM cross-reference

3115 2129 00

Reference image

Available

About Epiroc 3115 2129 00 PISTON (ME/MEX)

This piston is a key element of the REPAIR SET in the Sandvik Boomer 282. It operates under extreme cyclic loading and high-pressure hydraulic conditions. Maintaining OEM-specification pistons ensures optimal percussion energy transfer and maximizes rock-breaking performance.

This is an OEM-compatible aftermarket replacement part for the Epiroc Boomer 282 (Boomer 282). BK Drilling supplies this part with fast worldwide shipping and competitive pricing.

Frequently asked questions

How does a worn piston affect drilling performance?

A worn piston reduces percussion energy transfer, decreasing penetration rate and increasing the time and energy required to drill each hole. This directly impacts productivity and operating costs in mining operations.