BK DRILLING
0516404900 0516 4049 00 0516-4049-00 – NEEDLE BEARING
Representative Photo
Drawing not available
Technical Drawing

Epiroc / Atlas Copco

0516 4049 00 – NEEDLE BEARING

COP 1032HD Rock Drill Spare Part

Available — Request Quote
Part Number0516 4049 00
Description– NEEDLE BEARING
BrandEpiroc (Atlas Copco)
AssemblyROCK DRILL COP 1032HD
TypeRock Drill Spare Part

Compatibility

Drifter Models

COP 1032HD

Machine Models

Quick answer

0516 4049 00 (also written 0516404900, 0516-4049-00, or 0516.4049.00) is a Epiroc – needle bearing spare part used in the ROCK DRILL COP 1032HD assembly of the Epiroc COP 1032HD. Verified compatible with 1 Epiroc machine model including COP 1032HD. Used in 1 drifter configuration (COP 1032HD). Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.

Part code alternate forms: 0516404900, 0516 4049 00, 0516-4049-00.

Compatible machines

1

Drifter configurations

1

OEM cross-reference

0516 4049 00

About Epiroc 0516 4049 00 – NEEDLE BEARING

This high-performance bearing is designed for the Sandvik COP 1032HD and serves a critical role in the ROCK DRILL COP 1032HD. It supports rotating elements under heavy axial and radial loads typical in underground and surface drilling applications, ensuring smooth and reliable machine operation.

This is an OEM-compatible aftermarket replacement part for the Epiroc COP 1032HD (COP 1032HD). BK Drilling supplies this part with fast worldwide shipping and competitive pricing.

Frequently asked questions

Why are bearings critical in drilling equipment?

Bearings support rotating shafts and components under extreme loads and vibrations. Failed bearings can cause catastrophic damage to gearboxes, drive trains, and drilling mechanisms, leading to extended downtime and costly repairs.

What causes premature bearing failure in mining equipment?

Common causes include contamination from dust and water ingress, misalignment during installation, excessive loads, inadequate lubrication, and operating beyond rated temperature ranges. Proper sealing and regular lubrication schedules are essential preventive measures.