BK DRILLING
0501000039 0501 0000 39 0501-0000-39 BEARING,SP.PL.
Representative Photo
0501000039 0501 0000 39 0501-0000-39 BEARING,SP.PL. - Epiroc Technical Drawing
Technical Drawing
Click to enlarge

Epiroc / Atlas Copco

0501 0000 39 BEARING,SP.PL.

Boomer E2 C Drill Rig Spare Part

Available — Request Quote
Part Number0501 0000 39
DescriptionBEARING,SP.PL.
BrandEpiroc (Atlas Copco)
AssemblyBOOM BODY
TypeDrill Rig Spare Part

Compatibility

Machine Models

Quick answer

0501 0000 39 (also written 0501000039, 0501-0000-39, or 0501.0000.39) is a Epiroc bearing,sp.pl. spare part used in the BOOM BODY assembly of the Epiroc Boomer E2 C. Verified compatible with 1 Epiroc machine model including Boomer E2 C. Available as an aftermarket replacement drill part from BK Drilling — Turkey-based Sandvik and Epiroc spare parts supplier serving mining contractors worldwide. Quote on request via WhatsApp; typical lead time 3-7 days for stock items.

Part code alternate forms: 0501000039, 0501 0000 39, 0501-0000-39.

Compatible machines

1

OEM cross-reference

0501 0000 39

About Epiroc 0501 0000 39 BEARING,SP.PL.

Engineered to withstand the extreme loads and vibrations encountered in drilling operations, this bearing maintains precise alignment of rotating components in the Sandvik Boomer E2 C. As part of the BOOM BODY, proper bearing maintenance is essential for optimal drill performance and reduced machine downtime.

This is an OEM-compatible aftermarket replacement part for the Epiroc Boomer E2 C (Boomer E2 C). BK Drilling supplies this part with fast worldwide shipping and competitive pricing.

Frequently asked questions

Why are bearings critical in drilling equipment?

Bearings support rotating shafts and components under extreme loads and vibrations. Failed bearings can cause catastrophic damage to gearboxes, drive trains, and drilling mechanisms, leading to extended downtime and costly repairs.

What causes premature bearing failure in mining equipment?

Common causes include contamination from dust and water ingress, misalignment during installation, excessive loads, inadequate lubrication, and operating beyond rated temperature ranges. Proper sealing and regular lubrication schedules are essential preventive measures.